BIM Modeling Services for the Lincoln Middle School Renovation in Oregon

Please Note:

We are committed to protecting the confidentiality of our clients. As such, we are unable to publicly share specific BIM models. However, we can provide you with detailed case studies and information about our BIM expertise.

Project Overview: Lincoln Middle School Renovation

Client
Washington County School District
LocationPortland, Oregon
ProjectLincoln Middle School Renovation
IndustryEducation and School Infrastructure
Services ProvidedArchitectural, Structural, and MEP BIM Modeling (LOD 500)
Tools

Autodesk Revit, Navisworks, Bentley MicroStation

Project Brief

The Lincoln Middle School renovation focused on modernizing the 350,000-square-foot facility. The main goal was to upgrade classrooms, improve infrastructure, and enhance the school’s energy efficiency. BuildHub was engaged to provide comprehensive BIM modeling services, including architectural BIM services, structural BIM services, and MEP BIM modeling services, at LOD 500 to streamline design and construction.

Project Details

Building Type: Educational Facility

Area: 350,000 sq. ft.

Scope of Work: BIM modeling for architectural, structural, and MEP systems

Technology Stack: Autodesk Revit, Navisworks, BIM 360

Project Challenges

The Lincoln Middle School renovation presented several challenges that required an advanced BIM strategy:

Complex Existing Conditions

The facility had undergone multiple renovations over the decades, creating a complex web of interconnected systems that lacked detailed as-built documentation.

Tight Timeline

The renovation was scheduled to be completed over the summer break, allowing no room for delays to avoid disruption during the school year.

Interdisciplinary Coordination

The project involved the precise alignment of architectural, structural, and MEP systems, requiring seamless BIM coordination services to prevent errors and delays.

Get a Free Quote

Need help with BIM services?

Contact us today for a free quote and let our experts handle your project with precision and care.

(360) 718-5599

BuildHub's Solution

BuildHub was engaged to offer a comprehensive BIM solution to overcome the project’s challenges, focusing on enhancing collaboration and efficiency across disciplines. Our solution included:

Data Integration
We began by integrating various data sources, such as legacy as-built drawings and laser scan data, into a cohesive 3D BIM model. This provided an accurate representation of existing conditions, which was essential for the design team.
Detailed BIM Modeling
BuildHub developed highly detailed architectural, structural, and MEP BIM models according to LOD 500 standards. These models ensured that every system was represented accurately, helping teams visualize interactions early in the design process.
Clash Detection and Resolution
Using Autodesk Navisworks, BuildHub resolved over 250 clashes between architectural, structural, and MEP systems. Resolving these conflicts early in the project reduced costly rework during construction and improved efficiency.
Interdisciplinary Coordination
With Autodesk BIM 360, BuildHub facilitated real-time collaboration between all disciplines. This allowed for efficient task coordination and kept teams aligned throughout the project, ensuring timely updates and design consistency.
Model Optimization for Constructability
Throughout the project, BuildHub continuously optimized the BIM models for constructability. This included simplifying the arrangement of systems to reduce potential construction delays and improve on-site efficiency.
Want to streamline your BIM modeling projects?

Let us help you make the most of BIM technology.

BuildHub

Project Outcomes

BuildHub’s BIM modeling services delivered measurable success for the Lincoln Middle School renovation:

Improved Interdisciplinary Coordination

Collaboration across architectural, structural, and MEP teams reduced design iterations by 20%, keeping the project on track.

Reduced Errors and Rework

Identifying and resolving over 250 clashes before construction helped prevent errors, saving both time and project costs.

Optimised Construction Planning

The use of detailed 3D BIM models led to a 10% reduction in overall construction time, ensuring the project met its summer deadline.

Cost Savings

Through early-stage BIM coordination services and improved planning, BuildHub’s approach saved the Washington County School District approximately $200,000.

Key Results and Benefits

Construction Time Reduction

10%

Cost
Savings

$200,000

Clashes Detected and Resolved

250+

Model Creation Time

12 weeks

Design Iterations Reduction

20%

Testimonial

Conclusion

By leveraging advanced BIM modeling services, BuildHub transformed Lincoln Middle School into a modern, energy-efficient educational facility. Our precise, detail-oriented approach helped overcome complex challenges, ensuring timely completion and cost efficiency. This case study demonstrates the value of BIM technology in improving project outcomes and reducing risks.